CTRoom

Medical Imaging Equipment Site-Prep

CT imaging equipment inside operating Medical facility

1,100 square foot remodel, site-prep, for CT Room inside operating medical facility.  This project involved infection control measures, demolition, structural steel, unistrut for ceiling gantry system, lead lined drywall, lead lined doors and frames, automatic door controls, door hardware, painting , nurse call system, electrical upgrade, UPS upgrade, HVAC, plumbing, fire alarm, fire sprinkler, thermal insulation, firestopping, low voltage phone and data wiring, acoustical ceiling, concrete, ceramic tiling, resilient sheet flooring, wall and door protection, with coordination across several trades.