rickberg

Department of Veterans Affairs – Generator- Sioux Falls, SD

By rickberg / April 10, 2024 /

Addition of additional standby generator capacity to include upgrades to existing incoming power systems at the Sioux Falls, SD VA Health Care System. Construction included the installation of two additional 2-megawatt generators and a new control building to synchronize utility power and generator power.

Read More

Department of Veterans Affairs – Centralized Services

By rickberg / April 10, 2024 /

Design-Build project at the 1,500,000 square foot Minneapolis VA Health Care System covering multiple areas for an expanded centralized check-in and ancillary service area for all Primary Care Clinics (4D, 4E, 4F) to allow for better efficiency and flexibility in patient wayfinding, appointment wait times, and staffing requirements. The project included blood draw stations with…

Read More

VA Basement Floor-Minneapolis, MN

By rickberg / April 10, 2024 /

Greenstone Construction provided all labor, materials, and equipment for the replacement of fifteen basement corridors in the 1,500,000 square foot VA Medical Center in Minneapolis, MN. Following moisture testing of the basement slab on grade, the project required our team to remove all existing floor finishes and adhesive down to the concrete slab, remove existing…

Read More

USACE-Boiler-Elwood, Illinois

By rickberg / April 10, 2024 /

Repair HVAC and electrical systems at the 88th RD U.S. Army Reserve Center (USARC) Bldg. No. 1 in Elwood, IL. This project included demolition; interior concrete removal and concrete placement; interior and exterior steel doors, acoustical ceiling tiles and grids LED fixtures, resilient flooring; HVAC equipment; direct digital controls; testing, adjusting, and balancing (TAB); commissioning;…

Read More

Indian Health Services-IPC Space, Yakama, WA

By rickberg / April 10, 2024 /

Our project team provided all supervision, labor, material, and equipment for demolition, system and equipment upgrade, and utilities for Indian Health Services (IHS) Yakama Health Center Complex in Toppenish, WA. The project included replacement of chiller with a new high efficiency chiller, chilled water pump, and two new split system heat pumps for the waiting…

Read More

BIA Generator Replacement, Fort Yates, North Dakota

By rickberg / April 10, 2024 /

Project included all labor, materials, and incidentals for the replacement of the existing (temporary) emergency generator at the Standing Rock Reservations in Ft. Yates, ND. The work consisted of demolition to existing louvers, excavating for the foundation, pouring a continuous concrete foundation wall and pad, placing a brand new generator, electrical work, masonry patching of…

Read More

USACE Design Build Window Replacement, Minneapolis, MN

By rickberg / April 10, 2024 /

Design-Build project for the U.S. Army Corps of Engineers at the 1,500,000 square foot Minneapolis VA Medical Center consisting of the removal of all of the existing pivoting window sashes and replacement with stationary sashes to maximize energy efficiency, eliminate cold migration, and prevent condensation and frost during cold weather. Greenstone coordinated with every department…

Read More

USACE Design Build Tuckpointing , Minneapolis, MN

By rickberg / April 10, 2024 /

Design-Build project for the renovation and rehabilitation of the façade of Building 70 at the 1,500,000 square foot Minneapolis VA Health Care System. Our work encompassed the brick façade of the four-story, multiple-wing building. Greenstone provided all labor, materials, tools, and equipment necessary for the inspection and inventory of deficiencies in the mortar joints and…

Read More

VA- Repair Pavement , Minneapolis, MN

By rickberg / April 10, 2024 /

Greenstone worked to provide labor, materials, and equipment for pavement repairs at the Minneapolis, MN VA Medical Center. The project was completed in two phases and the work included crack seal for lots 5,6,7,9,10 and 73; micro-surfacing for lots 7,9,10, and Drive Area 1; fog-seal for lots 5,7, and 73; traffic control, and restriping for…

Read More

USDA Laboratory, Fargo, ND

By rickberg / April 10, 2024 /

1,110 square foot design-build project at the USDA Edward T. Schafer Agricultural Research Center (ETSARC) building in Fargo, ND. Greenstone converted three laboratories into two larger laboratories of 500 square feet each, removed east and south walls from a storage closet to add 20 feet of space to another laboratory, and updated and remodeled one…

Read More