rickberg

USACE Boiler – Bismarck, ND

By rickberg / April 10, 2024 /

Greenstone Construction replaced the existing steam boiler plant system (boiler, condensate return unit, steam heat exchanger, and steam heating coils) at the Lewis and Clark U.S. Army Reserve Center in Bismarck, ND. The new hydronic heating system consisted of three hydronic boilers, pumps, air separator, side stream filter, flow meter, valves, piping, direct digital controls,…

Read More